- Project Name: YMCA Camp Chief Hector
- Project Location: Kananaskis Country, Alberta, Canada
Project Challenge:
SD was contracted to update the water and wastewater servicing at this remote youth camp located in the mountains. We were also requested to modify the existing water treatment system.
Solution:
A community wastewater system was designed and installed along with a new 5,000 igpd secondary treatment and disposal system utilizing Orenco AX100 technology. Disposal is via chambered trenches. The modification of the existing water treatment system involved the combination of two existing groundwater wells and a new distribution network.
Result/Performance Data:
The wastewater treatment system has been operating since 2011 and is meeting approval standards.
The potable water system was constructed in 2015 and is in full operation since 2016.